Got the 2nd floor addition completed this winter that added an additional 600s.f. to the shop.
Built a loft on one end with a 5 x 9 opening to hoist bikes, engines, etc up using a truck crane and electric winch! Works like a charm and gives lots of bench space for engine rebuilds!