The final crank showed up today so cleaned and checked bearing clearances. Crank now assembled with Carrillo rods ready to into cases. Still waiting on other internals before I can button up the bottom ends in both motors. Slowly coming together...not sure if it is going to get done by spring time. Lot of work goes into building two motors.
About a cups worth...plus the piece that found its way into my left eye that needed to be removed! Safety glasses guys!!
So after getting over a 5 day long flu...I got one of the bottom ends together. RC crank, new bearings setup to .0018" clearance, undercut trans out of RC motor, new cryo treated primary chain, new heavy duty cam chain. Still waiting on parts and machine work from Cycle X, they are swamped and short on help but need to get these parts back, only have till April when track opens.
Bottom end going together. Lightened crank with Carrillo rods. Undercut tranny gears and a couple of new tranny bearings. Heavy duty primary chains and heavy duty cam chain. All parts and machine work for motors coming from Cycle X. Had an issue on a previous build but after issues from other companies I am now back at Cycle X. Lot of help and information coming from Kenny at Cycle X on these builds.

Chamber opened up to match piston diameter and shape...it is pretty close to a full hemi chamber. Need to do some final calculations but should still be in the 12 1/2 to 1 compression range. Now some final polishing of the chambers and final cleaning and I can move on with the final assembly. Crossing my fingers but hoping to have it in the frame this weekend and possibly a first fire up.


